At ITP Service, we have over 40 years of experience in providing the best personalised solutions to the international sector of gas, oil and water pipelines and tanks, for both industrial or public consumption.
Pipeline and tank services
Significant projects
NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”
Client: IDC CONSORTIUM
Country: Serbia
Year: 2020
Scope: 250 km x Ø 48” / 402 km x Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.
Pressure testing Dewatering Extra-dry air drying Pipeline inertisation Caliper PigNPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5
Client: BONATTI SPA
Country: Bulgaria
Year: 2020
Scope: 98.5 km x NPS Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying.
Pressure testing Dewatering Extra-dry air dryingClients who have placed their trust in us



































