NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”

Client: IDC CONSORTIUM

Country: Serbia

Year: 2020

Scope: 250 km x Ø 48” / 402 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.

Pressure testing Dewatering Extra-dry air drying Pipeline inertisation Caliper Pig

NPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5

Client: BONATTI SPA

Country: Bulgaria

Year: 2020

Scope: 98.5 km x NPS Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying.

Pressure testing Dewatering Extra-dry air drying

TRANS ADRIATIC PIPELINE PROJECT - LOT 2 & 3 48”

Client: BONATTI

Country: Greece

Year: 2018 - 2019

Scope: 366 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying and nitrogen services.