At ITP Service, we collaborate with Baker Hughes, to offer the service of transferring natural gas from one system or pipeline to another, with a discharge pressure of up to 100 bar and a residual pressure close to 0 bar.

We use the leading gas compressors on the market, which have helped us to substantially improve the efficiency of the service, increasing recovery volumes and reducing transfer times.

Our gas transfer service uses two kinds of compressors or a combination of both:

  • High pressure compressor
  • Low pressure compressor

Significant projects

NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”

Client: IDC CONSORTIUM

Country: Serbia

Year: 2020

Scope: 250 km x Ø 48” / 402 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.

Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig

NPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5

Client: BONATTI SPA

Country: Bulgaria

Year: 2020

Scope: 98.5 km x NPS Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying and pneumatic testing of stations and valves.

Pressure testing Extra-dry air drying Pneumatic test

TRANS ADRIATIC PIPELINE PROJECT – LOT 2 & 3 48”

Client: BONATTI

Country: Greece

Year: 2018 - 2019

Scope: 366 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.

Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig

Hire in a smart way.

Hire the professional gas transfer services.