At ITP Service, our mechanical pipeline cleaning service eliminates any residue that remains inside, as well as any metal fragments left over from the tooling and/or welding processes.

This cleaning process, prior to the appropriate use of pigs in the pipeline filling stage, is essential.

Significant projects

NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”

Client: IDC CONSORTIUM

Country: Serbia

Year: 2020

Scope: 250 km x Ø 48” / 402 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.

Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig

NPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5

Client: BONATTI SPA

Country: Bulgaria

Year: 2020

Scope: 98.5 km x NPS Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying and pneumatic testing of stations and valves.

Pressure testing Extra-dry air drying Pneumatic test

TRANS ADRIATIC PIPELINE PROJECT – LOT 2 & 3 48”

Client: BONATTI

Country: Greece

Year: 2018 - 2019

Scope: 366 km x Ø 48”

Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.

Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig

Hire in a smart way.

Hire the professional services of mechanical pipeline cleaning.