Services > Nitrogen services > Pipeline inertisation
For ITP Service, keeping facilities safe from explosions and preserving their physical and chemical characteristics at all times is essential. We can help clients by providing them with our extensive experience in pipeline nitrogen inertisation services.
Thanks to this system, we prevent corrosion and deterioration within industrial steel pipelines and create an inert atmosphere.
Significant projects
NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”
Client: IDC CONSORTIUM
Country: Serbia
Year: 2020
Scope: 250 km x Ø 48” / 402 km x Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.
Pressure testing Extra-dry air drying Pipeline inertisation Caliper PigNPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5
Client: BONATTI SPA
Country: Bulgaria
Year: 2020
Scope: 98.5 km x NPS Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying and pneumatic testing of stations and valves.
Pressure testing Extra-dry air drying Pneumatic testTRANS ADRIATIC PIPELINE PROJECT – LOT 2 & 3 48”
Client: BONATTI
Country: Greece
Year: 2018 - 2019
Scope: 366 km x Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.
Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig