Services > Pipeline cleaning and drying > Cleaning and drying
At ITP Service, we provide the pipeline cleaning and drying service to eliminate with mechanical methods any water or humidity that may remain after the dewatering process and that may accumulate around the wall along the pipeline.
As an alternative to this pipeline cleaning and drying system using mechanical methods, we also have a pipeline drying process with extra-dry air (at dew point).
Significant projects
NPS 48 INCH X 250 KM TRANSMISSION GAS PIPELINE (INTERCONNECTOR) “BORDER OF BULGARIA”
Client: IDC CONSORTIUM
Country: Serbia
Year: 2020
Scope: 250 km x Ø 48” / 402 km x Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.
Pressure testing Extra-dry air drying Pipeline inertisation Caliper PigNPS 48 INCH X 41,7 KM BALKAN STREAM BULGARIA SECTION A4 / NPS 48 INCH X 56,8 KM BALKAN STREAM BULGARIA SECTION A5
Client: BONATTI SPA
Country: Bulgaria
Year: 2020
Scope: 98.5 km x NPS Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying and pneumatic testing of stations and valves.
Pressure testing Extra-dry air drying Pneumatic testTRANS ADRIATIC PIPELINE PROJECT – LOT 2 & 3 48”
Client: BONATTI
Country: Greece
Year: 2018 - 2019
Scope: 366 km x Ø 48”
Completed works: Hydrostatic pressure testing, extra-dry air drying, Caliper Pig evaluating and nitrogen services.
Pressure testing Extra-dry air drying Pipeline inertisation Caliper Pig